For more information about how Halldale can add value to your marketing and promotional campaigns or to discuss event exhibitor and sponsorship opportunities, contact our team to find out more
The Americas -
holly.foster@halldale.com
Rest of World -
jeremy@halldale.com

A viable advanced air mobility sector requires more than aircraft and pilots. It necessitates a comprehensive physical and digital ecosystem. Yet infrastructure development, vertiport construction, charging systems, maintenance facilities, air traffic management integration, remains the least mature element of the ecosystem.
Infrastructure: The Missing Piece
Archer Aviation has revealed plans for a Miami metropolitan air taxi network, partnering with entities including Related Ross and the Magic City Innovation District to connect Miami, Fort Lauderdale and West Palm Beach via 10-20 minute flights, adapting existing helipads at venues including Hard Rock Stadium.
The Miami network represents a pragmatic approach: leverage existing helicopter infrastructure where possible, minimising upfront capital requirements and planning approval timelines. However, existing helipads were designed for lower-frequency operations and may lack the charging infrastructure, passenger facilities, and throughput capacity required for high-volume air taxi services.
Internationally, Falcon Executive Aviation is developing Dubai's first fully private, multi-modal FBO terminal integrating private jets, helicopters and eVTOLs under one gateway. The facility represents a different model: purpose-built infrastructure designed from the outset for mixed-mode operations. Dubai's approach reflects the significant capital investment required to create true vertiport networks rather than adapted helicopter facilities.
The Investment Challenge
Saudi Arabia's $100 billion aviation investment under Vision 2030 includes provisions for advanced air mobility infrastructure. The scale of commitment reflects the reality that viable eVTOL operations require coordinated investment across multiple infrastructure elements simultaneously.
Beyond physical infrastructure, air traffic management integration presents complex technical and regulatory challenges. Low-altitude urban airspace is congested with helicopter operations, drone activity, and conventional aircraft approaches. Integrating high-frequency eVTOL operations requires new traffic management systems, communication protocols, and separation standards that are still under development.
Charging infrastructure presents another challenge. High-power charging for rapid turnaround times requires electrical grid capacity that may not exist at desired vertiport locations. Battery swapping offers an alternative but requires standardisation across manufacturers.
Coordination Complexity
The fundamental challenge appears to be coordination. Aircraft certification, pilot training, vertiport construction, charging infrastructure, air traffic management systems, and regulatory approvals must advance in parallel for commercial operations to begin. Misalignment between these elements could well constrain deployment regardless of aircraft readiness.
How will manufacturers balance the need for early market entry through pilot programmes against maintaining the rigorous safety standards essential for public acceptance? Will infrastructure development keep pace with aircraft certification, or will it become the limiting factor?
The Business Case Question
Perhaps most critically, the business case for high-utilisation, low-cost urban flight has yet to be proven commercially. Infrastructure investment requires confidence in operational economics: passenger volume projections, pricing models, utilisation rates, and operating costs. Without demonstrated commercial viability, securing the capital required for infrastructure development will remain challenging.
The arrival of training devices at Joby signals the industry is thinking beyond prototypes to operational readiness. Manufacturing is scaling, flight hours are accumulating, regulatory pathways are being established. Yet infrastructure remains the wildcard that could determine whether ambitious timelines prove achievable or slip beyond the horizon.
Industry Perspectives Needed
Halldale plans to explore infrastructure readiness in greater depth. We invite industry perspectives on the critical path items for infrastructure development. What are the real bottlenecks? Where should investment be prioritised? And how can the industry coordinate across multiple stakeholders to ensure infrastructure readiness aligns with aircraft certification timelines?
The progress is undeniable. The challenges are substantial. The timeline remains uncertain.