We use cookies to provide you with a better experience. By continuing to browse the site you are agreeing to our use of cookies in accordance with our Cookie Policy. In addition, the California Consumer Privacy Act ("CCPA") provides certain rights with respect to your personal information. Please click here for more information.

Halldale Logo
  • Shop
  • Contact us
  • About
    • About Halldale
    • Awards
    • Media & Advertising
    • Our Events
    • Sim Industry Buyer's Guide
    • Why Simulation
    • FAQ's
  • Sign In
  • Register
  • Sign Out
  • My Account
  • Memberships
Toggle Mobile MenuCartToggle Mobile Menu
  • Shop
  • Contact us
  • About
    • About Halldale
    • Awards
    • Media & Advertising
    • Our Events
    • Sim Industry Buyer's Guide
    • Why Simulation
    • FAQ's
  • Civil Aviation
    • ATC
    • Cabin Crew
    • eVTOL
    • Maintenance
    • Pilot
    • Regional Pilot
    • Regulation
    • Rotary
  • Defence
    • Air
    • Land
    • Sea
    • Joint/Cyber
  • Safety Critical Training
    • Construction
    • Medical
    • Engineering
    • Workforce Development
    • First Responder
    • Road Transport
    • Oil and Gas
    • Rail
    • Nuclear and Power Generator
    • Maritime
    • Mining
  • Performance Improvement
  • Events
  • Directories
    • Sim Census
    • About S&T Industry Buyer's Guide
    • S&T Industry Buyer's Guide
  • Magazines
    • CAT Magazine
      • About CAT
      • Editorial Schedule
      • Next Issue
      • Digital Edition
      • PDF Downloads
    • MS&T Magazine
      • About MS&T
      • Editorial Schedule
      • Next Issue
      • Digital Edition
      • PDF Downloads
    • SCT Publications
      • About SCT
Toggle Mobile MenuCartToggle Mobile Menu
  • Sign In
  • Register
  • Sign Out
  • My Account
  • Memberships
Home » Saab, Lockheed Martin receive US Army change order to modernize VTESS code
Looking to read the full article? Register today!

Saab, Lockheed Martin receive US Army change order to modernize VTESS code

October 31, 2018
Amanda Towner
Lockheed Martin, in partnership with Saab, received a $17.7-million change order to provide modernized VTESS code to the U.S. Army Vehicle Tactical Engagement Simulation System (VTESS) contract that was awarded originally in July 2017. The VTESS Code Modernization effort is to integrate one-way and ballistic simulations, and provide integration into...
Defence Joint/Cyber
Already a member? Sign In to access.

Please sign up for an account to get unlimited access today!

Upcoming Events

  • 08Nov2022

    EATS 2022 - European Airline Training Symposium

Featured Stories

  • JesperRasmussen_EATS.jpg

    Become a Speaker at EATS 2022

    Conference programmes are now being developed for two live conference streams at EATS 2022 - Pilot & Cabin Crew Training.
  • Brunner & Lufthansa Aviation Training Demo New NovaSim MR at EATS

    Training for Aviation’s Next Era

    Mark your diary! The landmark 20th edition of the European Airline Training Symposium (EATS) will take place at the Estrel Hotel, Berlin on 8-9 November, 2022.
  • cockpit

    Big Data Industry Working Group to Release Summary Report Soon

    The Big Data in Aviation Training working group expects to release a preliminary summary of its analysis this summer, following academic and peer review.

News on your terms!

Do you want:

Year-round access to all features posted on our website, both free and paid content.

Print copies of the magazines of your choice containing all-new material, Plus…..

Our industry newsletters as requested.


 

Make me a Member!

Featured Video

  • Mst 4 2020 kauchak reforge ptn
    Reforge - A New US Air Force Jet Pilot Training Construct
    MS&T Editor Andy Fawkes and Halldale Group Editor Marty Kauchak sit down to discuss Reforge, a new U.S. Air Force Jet Pilot Training Construct.

Register with Halldale.com

Register today for:  

Unlimited access to news and stories*

Event information

Latest Halldale news

*Premium content requires membership

Register
Footer logo

Sentinel House, Harvest Crescent,
Fleet, Hampshire, GU51 2UZ, UK

Tel: +44 (0)1252 532000
Fax: +44 (0)1252 512714

4300 W Lake Mary Blvd Suite 1010 #343 Lake Mary, FL 32746

Tel: +1 407 322 5605
Fax: +1 407 322 5604

LATEST MAGAZINE ISSUES

Cat 1 2022 cover

Civil Aviation Training

April 27, 2022
Ms&t 1 2022 front cover

Military Simulation and Training

April 20, 2022
Sct newsletter dec2019

Safety Critical Training

June 23, 2022
  • NAVIGATION
    • About Us
    • Contact
    • Events
    • Magazines
    • Sim Census
    • Privacy Policy, Terms and Conditions
  • USERS
    • Sign in
    • Register
    • Memberships
Copyright ©2022. All Rights Reserved Halldale Group. Design, CMS, Hosting & Web Development :: ePublishing
Facebook Twitter Instagram Linkedin